Fandom

Epic Mickey Wiki

Crane (Building a Building)

800pages on
this wiki
Add New Page
Talk0 Share

The Crane is a steam shovel with a mean expression on the front and only appeared in Building a Building (1930). The Crane was eventually forgotten and was sent to Wasteland and somehow put to use on Mickeyjunk Mountain


As said above, In Epic Mickey, The crane appears at Mickeyjunk Mountain controlled by Decker to sort out the junk. Decker explains that the crane is broken and to power it, Mickey either needs to paint in the TVs or find Gremlin Kip to repair the Crane.

It reappears in Epic Mickey 2: The Power of Two,. It also appears in Ventureland, as the Crane in the Construction Site. The Crane is also seen in the Building a Building part 1 projector in 2D form.

Notes

  • Despite looking 'evil' it has a soft side depending whom is operateing it.
  • In the cartoon it lifts it's own roof to resemble tiping a hat while in the game EM2 it uses it as a paltform.

Ad blocker interference detected!


Wikia is a free-to-use site that makes money from advertising. We have a modified experience for viewers using ad blockers

Wikia is not accessible if you’ve made further modifications. Remove the custom ad blocker rule(s) and the page will load as expected.